Generator Rental in Dubai & the UAE

26 sizes in stock, from a 5 KVA petrol portable you can lift into a pickup to a 250 KVA silent diesel set that powers an entire development. Same-day delivery across Dubai, next day UAE-wide, free load sizing before you commit and 24/7 breakdown support once you are running.

Range
5–250 KVA
Sizes
26 models
Delivery
Same day
Support
24/7
Silent diesel generator available for rent in Dubai

Every Generator Size We Rent

Compare the whole fleet in one table: output, fuel burn, noise and the job each size is built for. Click any row for full specifications, load examples and a size-by-size comparison.

Generator rental sizes from 5 KVA to 250 KVA with output, fuel type, phase, consumption and noise
Size Power Fuel Supply Fuel burn Noise Typical use Link
5 KVA4.0 kWDieselSingle1.1 L/h62 dB(A)Long-duration single-phase backup for guard huts and site officesView →
5 KVA4.0 kWPetrolSingle2.0 L/h68 dB(A)Shop fit-outs and joinery snagging where power is not yet liveView →
6.5 KVA5.2 kWPetrolSingle2.4 L/h69 dB(A)Fit-out crews running two or three power tools at onceView →
8 KVA6.4 kWPetrolSingle3.0 L/h72 dB(A)Multi-trade fit-out crews on one supplyView →
10 KVA8 kWDieselSingle1.9 L/h58 dB(A)Night works and noise-restricted zones in Downtown Dubai and Business BayView →
12 KVA9.6 kWDieselSingle2.3 L/h58 dB(A)Villas and offices with several AC units cycling togetherView →
15 KVA12 kWDieselThree2.9 L/h60 dB(A)Small construction sites needing 415 V three-phase plantView →
20 KVA16 kWDieselThree3.8 L/h62 dB(A)Villa and townhouse construction from foundation to handoverView →
25 KVA20 kWDieselThree4.7 L/h62 dB(A)Sites that outgrew a 20 KVA mid-projectView →
30 KVA24 kWDieselThree5.6 L/h63 dB(A)G+1 and G+2 building projectsView →
35 KVA28 kWDieselThree6.5 L/h64 dB(A)Projects whose load crept past what a 30 KVA can hold comfortablyView →
40 KVA32 kWDieselThree7.5 L/h65 dB(A)Medium construction sites with mixed heavy plantView →
45 KVA36 kWDieselThree8.4 L/h65 dB(A)Sites expecting the load to grow during the hireView →
50 KVA40 kWDieselThree9.4 L/h65 dB(A)Medium to large construction sitesView →
60 KVA48 kWDieselThree11.2 L/h66 dB(A)Standby duty on occupied buildings and hotelsView →
62.5 KVA50 kWDieselThree11.7 L/h66 dB(A)Tender and consultant specifications written in kWView →
70 KVA56 kWDieselThree13.1 L/h67 dB(A)Sites outgrowing a 60 KVA without wanting a second unitView →
75 KVA60 kWDieselThree14.0 L/h67 dB(A)Long-programme projects needing guaranteed availabilityView →
80 KVA64 kWDieselThree15.0 L/h68 dB(A)High-load duty through UAE summer conditionsView →
100 KVA80 kWDieselThree18.7 L/h68 dB(A)High-rise construction with tower cranes and hoistsView →
125 KVA100 kWDieselThree23.4 L/h69 dB(A)Long-duration continuous supply on major projectsView →
150 KVA120 kWDieselThree28.1 L/h70 dB(A)Whole-development primary supplyView →
175 KVA140 kWDieselThree32.8 L/h70 dB(A)Loads between 130 and 145 kW that fall between standard sizesView →
180 KVA144 kWDieselThree33.7 L/h71 dB(A)Projects needing close to 200 KVA capacity in a smaller footprintView →
200 KVA160 kWDieselThree37.4 L/h72 dB(A)Primary supply for major developments and infrastructureView →
250 KVA200 kWDieselThree46.8 L/h73 dB(A)Whole-development and campus primary supplyView →

Browse Generators by Power Band

Not sure where to start? Find the band that matches your job, then open the individual size for load examples and specifications.

What Size Generator Do You Need?

Getting this wrong is expensive in both directions. Too small and the set trips every time a motor starts. Too large and you burn fuel you do not need, and a diesel engine run below 30 percent load for months develops wet stacking — unburnt fuel in the exhaust that eventually needs a workshop visit. Aim to load the set to between 50 and 80 percent.

The five-step calculation

  1. List every piece of equipment that will run at the same time, with its wattage.
  2. Add them up. This is your running load in watts.
  3. Add about 30 percent on top for the surge when motors and compressors start.
  4. Divide the result by 1,000 to get kW, then by 0.8 to convert to KVA.
  5. Pick the next size up in our fleet, so you land at 50 to 80 percent loading.

Would rather not do the maths? Send us your equipment list on WhatsApp and we will size it for you, free, usually within the hour.

Quick sizing guide

Recommended generator size by type of job
Your job Size Link
Hand tools, lighting, a market stall or a mobile crew5 – 8 KVASee a typical set →
A villa, a shop, a clinic or a site office with AC10 – 15 KVASee a typical set →
Villa construction: mixer, vibrators, lighting and a cabin20 – 30 KVASee a typical set →
A medium site, a wedding, a warehouse standby supply40 – 60 KVASee a typical set →
A tower crane, a passenger hoist, a full site compound75 – 100 KVASee a typical set →
A whole development, a labour camp, industrial plant125 – 250 KVASee a typical set →

Diesel or petrol?

Petrol is lighter, cheaper to hire and instant to start, which suits short jobs and crews that move every day. We hire petrol at 5, 6.5 and 8 KVA. Diesel burns roughly half the fuel per hour, tolerates continuous running and is available right up to 250 KVA. The rule of thumb: under two weeks and under 8 KVA, petrol is fine; anything longer or larger should be diesel.

Why Hire Your Generator From Us

Own fleet, own transport

Every set in this list is ours, kept in our Al Lisaili yard and delivered on our own HIAB trucks. Nothing is sub-hired, so nothing slips because a third party let us down.

Serviced and load-tested before every hire

Sets are serviced, load-banked and inspected before they leave. You get a machine that has already proven it holds its rating, not one that is about to.

Free sizing before you commit

Send us the equipment list. We will tell you the right size, even when that means renting you something smaller and cheaper than you asked for.

24/7 breakdown response with swap-out

If a set faults on site we attend around the clock, and where it cannot be fixed quickly we replace the unit rather than leaving you waiting on parts.

Fuel, cables, boards and attendants

Scheduled refuelling, earth rods, cables, distribution boards, changeover panels and generator attendants are all available so you can hire one thing, not five.

Whole-UAE coverage

Dubai, Sharjah, Ajman, Umm Al Quwain, Ras Al Khaimah, Fujairah, Abu Dhabi and Al Ain — including farms, desert plots, free zones and remote infrastructure corridors.

Generator Rental FAQs

What size generator do I need for my site in Dubai?

Add up the running wattage of everything that will be on at the same time, then add roughly 30 percent for the surge when motors start, and divide by 0.8 to convert kilowatts to KVA. As a rough guide: hand tools and lighting need 5 to 8 KVA, a villa or small office 10 to 15 KVA, a villa construction site 20 to 30 KVA, a medium site or event 40 to 60 KVA, a high-rise with tower crane 100 KVA, and a whole development 150 to 250 KVA. Send us your equipment list and we will size it for free.

How much does generator rental cost in Dubai?

Price depends on the size, how long you need it, where it is going and whether you want fuel, an operator or a distribution board included. Monthly hire is by far the cheapest per day, and daily hire the most expensive. We quote a fixed price in writing with no hidden mobilisation charges, so tell us your dates and location and we will send exact figures.

Should I rent a diesel or a petrol generator?

Petrol sets are lighter, cheaper to hire and start instantly, which suits short jobs and crews that move daily — we hire them at 5, 6.5 and 8 KVA. Diesel sets use roughly half the fuel per hour, run far longer between services and are available in every size up to 250 KVA. Anything running more than about two weeks, or above 8 KVA, should be diesel.

What does a silent generator actually mean?

It means the set is built inside an acoustic canopy lined with sound-absorbing material. Our silent diesel sets run between 58 and 73 dB(A) at 7 metres depending on size, against about 68 to 72 dB(A) for an open-frame petrol unit that is a fraction of the power. For hotels, hospitals, residential towers and night works, silent is usually a permit condition rather than a preference.

How quickly can you deliver a generator?

Same day across Dubai for most sizes if you book before midday, and next day for the rest of the UAE. We run our own transport with HIAB crane trucks, so we are not waiting on a third party. Emergency and out-of-hours deliveries can be arranged.

Do you supply fuel, cables and a distribution board?

Yes. Every set is delivered with a full tank as standard, and we offer scheduled refuelling for continuous running. Earth rods, cables, distribution boards, changeover panels and generator attendants are all available as add-ons.

Can I rent a generator for one day only?

Yes. We hire by the day, the week, the month and for the length of a project. Short one-day hires for weddings, film shoots and emergency outages are routine.

Do you serve areas outside Dubai?

Yes — Sharjah, Ajman, Umm Al Quwain, Ras Al Khaimah, Fujairah, Abu Dhabi and Al Ain, including industrial zones, free zones, farms, desert plots and remote infrastructure corridors.

Get your generator quote today

Send the load, the dates and the site location. We confirm the right size, quote a fixed price and deliver — usually the same day within Dubai.